Via Tremola Sankt Gotthardpass

Airolo, Svizzera

La Via Tremola Sankt Gotthardpass è una salita di 11.8 chilometri. Questa è una salita di categoria superiore (HC). Si trova a Airolo, Ticino, Svizzera. La pendenza media di questa salita è del 7.6% con un massimo di 9%. La Via Tremola Sankt Gotthardpass sale da 1.210 metri all'inizio a 2.105 metri in cima, per un totale di 895 metri di ascesa.

Profilo

Via Tremola Sankt Gotthardpass Profilo

Fatti

Distanza 11.8 km
Dislivello 895 m
Pendenza Media 7.6 %
Pendenza Massima 9 %
Categoria della Salita HC
Altitudine Minima 1210 m
Altitudine Massima 2105 m

Scarica l'App

Unisciti a migliaia di appassionati di ciclismo nella nostra app myCols per iOS e Android. Collega il tuo GPS, tieni traccia di ogni col che conquisti e guadagna jerseys!

Scarica l'App per iOS  Scarica l'App per Android

Descrizione

Tremolastrasse is the longest road construction monument in Switzerland. As a bright band it winds up from Airolo to the Gotthard pass. You can enjoy an impressive view on the mule track from the pass to the upper Leventina.
The world-famous serpentine road on the left-hand slope of Val Tremola was created with the construction of the Gotthard pass road. In the most spectacular section, the four-kilometre-long road climbs 300 metres in 24 bends, which even bear their own names. The pass road between Göschenen and Airolo was built between 1827 and 1832 according to plans by the Ticino engineer Francesco Meschini, after the access roads to Basel and Chiasso had been continuously extended since the 1810s.
Today, Tremolastrasse is largely in the state of reconstruction completed in 1951. The six to seven meter wide road is bordered and supported by walls up to eight meters high. Some of the old dry stone walls still exist. The pavement with granite stones is largely preserved, as are the mile stones. The two street attendant houses have disappeared. The first was at the beginning of Tremola Street until its destruction in 1989. The second was further up, below Voltone. Destroyed by an avalanche in 1874, it was not rebuilt due to the approaching opening of the Gotthard railway in 1882.

- Tour de Suisse 2019 - Stage 7