Via Tremola Sankt Gotthardpass

Airolo, Suiza

La Via Tremola Sankt Gotthardpass es una subida de 11.8 kilómetros. Este es un subida de la categoría más alta (HC). Se encuentra en Airolo, Ticino, Suiza. La pendiente media de esta subida es del 7.6% con un máximo de 9%. La Via Tremola Sankt Gotthardpass sube de 1.210 metros al inicio a 2.105 metros en la cima, con un total de 895 metros de ascenso.

Perfil

Via Tremola Sankt Gotthardpass Perfil

Hechos

Distancia 11.8 km
Desnivel 895 m
Pendiente Media 7.6 %
Pendiente Máxima 9 %
Categoría de la Subida HC
Altura Mínima 1210 m
Altura Máxima 2105 m

Descargar la App

Únete a miles de aficionados al ciclismo en nuestra app myCols para iOS y Android. Conecta tu GPS, haz un seguimiento de cada col que conquistas y gana jerseys!

Descargar App para iOS  Descargar App para Android

Descripción

Tremolastrasse is the longest road construction monument in Switzerland. As a bright band it winds up from Airolo to the Gotthard pass. You can enjoy an impressive view on the mule track from the pass to the upper Leventina.
The world-famous serpentine road on the left-hand slope of Val Tremola was created with the construction of the Gotthard pass road. In the most spectacular section, the four-kilometre-long road climbs 300 metres in 24 bends, which even bear their own names. The pass road between Göschenen and Airolo was built between 1827 and 1832 according to plans by the Ticino engineer Francesco Meschini, after the access roads to Basel and Chiasso had been continuously extended since the 1810s.
Today, Tremolastrasse is largely in the state of reconstruction completed in 1951. The six to seven meter wide road is bordered and supported by walls up to eight meters high. Some of the old dry stone walls still exist. The pavement with granite stones is largely preserved, as are the mile stones. The two street attendant houses have disappeared. The first was at the beginning of Tremola Street until its destruction in 1989. The second was further up, below Voltone. Destroyed by an avalanche in 1874, it was not rebuilt due to the approaching opening of the Gotthard railway in 1882.

- Tour de Suisse 2019 - Stage 7